SAVE64.ORG
PUBLIC COMMENT re US 64 Corridor Study ends Wed. June 30
email NCDOT
June 1st, 2010
SAVE64.ORG thanks you for your support.
ALERT! The Apex/Cary community is under siege and you must act NOW to preserve and protect the integrity of your community. danthomas@ncdot.gov needs to hear from you ASAP, before June 30.
US 64 CORRIDOR STUDY DRAFT was made available to the public by NCDOT on May 5th You can view the study at Eva Perry Library in Apex or see it on line at: www.ncdot.gov/~us64study The study does not take in to account that 540 would be completed by 2014. Is the NCDOT 64 Corridor Study fundamentally flawed?
If NCDOT were truly listening to the community they should have realized by now that the community is opposed to their “Open Corridor Initiative”. The ultimate “Long Term” goal of the Open Corridor Initiative is to provide a non-stop route between Raleigh and Charlotte.
CAMPO (Capital Area Metropolitan Planning Organization) held a public hearing, Wednesday 5/19/10. Three community representatives made comments suggesting that changes are still needed in the US 64 Corridor Study. Both the towns of Cary and Apex are voting members of CAMPO and both towns are now studying the most recent DRAFT.
CARY’S TOWN COUNCIL on May 27, 2010, DIRECTED THE Cary staff to work with the Apex staff to “prepare a “unified response” to the US-64 Corridor Study Draft Final Report. Ideally, this “response” would take the form of a joint resolution, position statement, memo or other format advised by staff. The overarching objective of this effort is to identify the elements of common ground and formulate a “unified response” for the CAMPO/TAC members to consider prior to voting on the Report’s adoption. The respective governing boards (Cary and Apex) would consider the proposed “unified response” for adoption prior the August 2010 timeframe. The joint response would include only items where consensus exists or is achieved. Positions or concerns that are not “jointly shared” could be addressed outside of the joint response, however a collective response would facilitate any action requested of TAC when it considers adoption of the Report and its recommendations.
If you were not aware of CAMPO public hearing you are not alone! However, the communities’ concerns are being heard and CAMPO will not act on the Study report until after the Comment period has ended, June 30, 2010.
We believe that both our goal of preserving our existing community and NCDOT’s “Long Term Goal” of efficient flow of traffic can be achieved.
540 will provide the perfect By-Pass. The State can save millions of dollars by not needlessly transforming 64 into a “Super Street”.
NCDOT’s public comment period ends on June 30th.
Dan Thomas, US64 Corridor Study coordinator, has invited comments re Transportation Improvement Program Project number R-4469 via email/fax/phone:
Dan Thomas, NCDOT Planning Branch danthomas@ncdot.gov
FAX: (919) 733-2417 Phone: (919) 715-5482 ext. 389
Make your voice heard! What can you do to help?
Email and/or call the following:
Dan Thomas: NCDOT Transportation Planning: 919-715-5482 ext. 389 danthomas@ncdot.gov
Peter Trencansky, PE,URS Corp. (consultant to NCDOT’s US64 Corridor Study): 919-461-1332 peter_trencansky@urscorp.com
CAMPO Director, Ed Johnson: 919-993-4390 Ed.Johnson@campo-nc.us
NCDOT Secretary, Gene Conti: 919-733-2520 gconti@ncdot.gov
Let them know:
- You demand that the integrity of your existing community be preserved along the Apex/Cary 64 Corridor;
- You demand that 540 between US1 & US 64 West be designated as the 64 BYPASS.
- You demand that US64 be renamed Tryon Boulevard/Business 64 and that “Super Streets” not be constructed along the current US64 in Cary and Apex.
- That you demand that there be no toll between US 1 and US 64 via the 540 By-Pass.
- That you believe that the US64 Corridor Study is flawed because it never took the 2014 completion date of 540 into account
DOWNLOAD THE PETITION FORM HERE ON SAVE64!
In fact download many and give them to your neighbors and friends and get signatures to back it up. You can deliver your completed Petitions to the Kroger Customer Service Desk in Lake Pine Plaza (Lake Pine Rd/ US64) in Apex beginning May 19, 2010.
THANK YOU Kroger Foods! You are a COMMUNITY ASSET and we appreciate you!, Thank you for agreeing to accommodate us again in our efforts to guard, protect and preserve OUR COMMUNITY!
Thank you,
Save64.org
Through your voices & signatures and emails in 2009, we were able to make sufficient progress, (the elevated highway has been eliminated from the plan), but, our voices have not been completely heard.